Topics Map > Human Resource System (HRS) > HRS Customer Support

Viewing the Process Monitor in HRS

Overview

The Process Monitor is used to review the status of and download the outputs of any processes or reports that are run in PeopleSoft.

After you submit a job, use Process Monitor to review the status of scheduled or running processes. You can view all processes to see the status of any job in the queue and control processes that you initiated. Process Monitor consists of two pages: the Process List page and the Server List page. Use the Process List page to monitor the process requests that you submit. If a process encounters an error, or if a server is down, you can find out almost immediately. You can also see what processes are queued to run in the future.

Process Considerations:

  • You should see a status of processing in the Process Monitor after you submit a process or report to run.  This will change to success when the process or report has completed.  When you see a Distribution Status of Posted, your output is ready to be accessed.
  • A status of queued or blocked means that your report or process is in line to run behind other processes or reports.  When you see this status, do not resubmit your process or report to run.  It will run once the other process or report has completed. 
  • A status of error means that the report or process has not run to success and will not provide you with any outputs.  Verify the timing of when you are running this process or report and contact UW Shared Services in the event you are consistently receiving this message.
You may click on the links below to navigate directly to a section:

Instructions

  1. Log in to HRS or EPM and navigate to the report you wish to run.
  2. Once you have entered the Run Control ID, selected any required run parameters,and your process or report is ready to be run, click the Run button.

    Run Control Sample Page
  3. The HRS system will assign a unique Process Instance for your report or process.  Click the Process Monitor link to access the Process Scheduler Page.

    Process Monitor Hyperlink
  4. Click the Refresh button until the Run Status shows Success and the Distribution Status shows Posted. 
  5. Once the report has run successfully, click the Details link.

    Details Link
  6. On the Process Detail screen, choose View Log/Trace.

    View Trace Log link
  7. To retrieve your output report (if applicable), click on the appropriate link on the View Log/Trace screen.  You should see a pop up window asking if you want to open or save your output report. 

    NOTE:  The pop up window will vary depending on the browser used.  (PDF – Portable Document Format, an image or snapshot; CSV – Comma-Separated Values, can be manipulated via MS Excel or other spreadsheet software; XLS – MS Excel, originated and saved in MS Excel)

    Link to Output
  8. To go back to the Process Detail screen, click the Return button.


Keywords:
Process Monitor Report Reporting Processes XML TAM HR Absence Payroll Benefits scheduler PY, Payroll PY, Payroll PY, Payroll 
Doc ID:
16541
Owned by:
Trevin G. in UW–Shared Services
Created:
2011-01-11
Updated:
2024-05-14
Sites:
UW–Shared Services